Coal Mining

Coal mining - extracting, processing and finishing part of the coal deposits are planned in the coal (brown coal and peat mining). - The selection of the technically and economically most suitable extraction process is determined, above all, deposit type and Flöztyp, hardness and thickness of the upcoming coal, power and nature of the overburden and the surrounding rocks and the available technical facilities.

The opencast mine is divided into the Department of overburden and the Department of coal mining. the Department of overburden Win in the dredging spoil and give it to conveyor belts or open car. These funds carry the muck in the charred surface mining (butt). In the Department of coal mining, coal is with the help of excavators and conveyor belts won or dump cars from the mine transported to the consumer.

The degradation can be more stacked benches in front of him to go. Coal mining are to also treatment plants, where coal crushed, washed and graded is (brown coal is washed in not), briquette, in which fine-grained coal with or without binders into briquettes are pressed and dried (brown coal without binder briquettes in), and some cases, coking plants, Schweelereien, power plants, and compressed natural gas stations in which electric energy coal, coke, coal gas and other useful materials produced are prepared from, and means for maintaining the equipment in these plants.

The opencast mine was economically important because he is the economy the most important primary energy source, lignite, provides. - The brown coal deposits are located in the Halle-Bitterfeld to Leipzig, Zeitz-Weissenfels and Lower Lausitz. The focus of the lignite is shifting more and more white water, etc.) to Lower Lausitz (Cottbus the. - The coal industry has, due to favorable geological and low occurrence becomes irrelevant. The low coal stocks were mainly in Zwickau. - The peat cutting has in predominantly local significance. Large peat deposits are found mainly in the north. Here, peat extraction is the current focus.
READ MORE - Coal Mining

TANJUNG BARA ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TANJUNG BARA ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

Name of Loading Port : Tanjung Bara, Lubuk Tutung
Name of Transhipper : FTS “BULK PIONER” (Moveable)
Position : Lat 00-32' North / Long 117-39-30 East
Lat 00-45 North / Long 117-47-00 East
Loading Method : 1. FTS (Floating Transfer Station)
2. Ship Cranes + Grab)
Port Restriction : No Restriction (Open Sea)
Loading Rate : 1. 15,000 MT - 20,000 MT/Day2. 10,000 MT - 12,000/Day
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday
READ MORE - TANJUNG BARA ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TANJUNG BARA COAL TERMINAL [ INDONESIAN COAL LOADING PORT ]

TANJUNG BARA COAL TERMINAL [ INDONESIAN COAL LOADING PORT ]

Position : Lat 00-32' North / Long 117-39' East
Port Restriction : - Max Draft at
: 17,25 M + high tide - 0.75 UKC
- Max Beam : 50 M
- Max LOA : 300 M
- Max Air Draft : 22 M
Depth of Berth : 17.25 L.A.T
Loading Facility : 2 Ship's Loader
Average Loading Rate : 3,500 MT - 4,000 MT
Grabs : Most of the shipment provide by vessel Grabs
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday
READ MORE - TANJUNG BARA COAL TERMINAL [ INDONESIAN COAL LOADING PORT ]

TANJUNG PEMANCINGAN ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TANJUNG PEMANCINGAN ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

Position : Lat 03-12-00 South / Long 11-21-40 East (max Draft 15 M-19 M)
Lat 03-12-04 South / Long 116-19.6 East (max Draft about 18 M)
Port Restriction : No Restriction (Open Sea)
Loading Rate : - 5,000 - 7,000 MT/Day (by Ship's geared/grabs)
- About 10,000 MT/Day by Floating Crane
Grabs : Most of the shipment provide by vessel Grabs
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday
READ MORE - TANJUNG PEMANCINGAN ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TANJUNG PEUTANG ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TANJUNG PEUTANG ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

Position : Lat 03-48-00 South / Long 115-59-00 East (max Draft 13 M)
Port Restriction : No Restriction (Open Sea)
Loading Rate : - 8,000 - 10,000 MT/Day approx (by Ship's geared/grabs)
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday
READ MORE - TANJUNG PEUTANG ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TABONEO (BANJARMASIN) ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

TABONEO (BANJARMASIN) ANCHORAGE [ INDONESIAN COAL LOADING PORT ]

Position : - Handy Size : 03-04-00 South / 114-25-00 East
- Panamax : 03-40-30 South / 114-26-00 East
- Cape Size : 03-40-00 South / 114-25-00 East
Port Restriction: No Restriction (Open Sea)
Loading Method : - By Ship's Gear and Grabs
- By Floating Cranes and Grabs
Loading Rate : - 7,500 MT - 9,000 MT/Day by Ship's Gear and Grabs
- 10,000 MT - 15,000 MT /Day/One Floating Cranes
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday
READ MORE - TABONEO (BANJARMASIN) ANCHORAGE [ INDONESIAN COAL LOADING PORT ]